Skip to product information

Peabody Engineering

Peabody Engineering Van Stone Style Flanges, PVC Sch 80 (1/2" to 12")

Peabody Engineering Van Stone Style Flanges, PVC Sch 80 (1/2" to 12")

SKU: 02-35994

3-5 Weeks
Regular price
Price: $15.91
Regular price
List Price:
Sale price
Price: $15.91
Size
Type
View Cart

Description

Peabody Engineering Van Stone style flanges in Schedule 80 PVC, from 1/2" to 12", as socket, threaded or blind flanges.

Choose the size, then socket, threaded or blind. Bolt kits, gaskets and expansion joints are sold separately.

Key Features
  • Van Stone Style: Schedule 80 PVC flange
  • Three Types: Socket, threaded or blind
  • 1/2" to 12": Twelve sizes
Specifications
  • Sizes: 1/2", 3/4", 1", 1-1/4", 1-1/2", 2", 3", 4", 6", 8", 10", 12"
  • Material: PVC Sch 80
  • Types: Socket (SOC), threaded (THD), blind
  • Manufacturer Part Numbers: 02-35994 (1/2", Socket); 02-36006 (1/2", Threaded); 02-36018 (1/2", Blind); 02-35995 (3/4", Socket); 02-36007 (3/4", Threaded); 02-36019 (3/4", Blind); 02-35996 (1", Socket); 02-36008 (1", Threaded); 02-36020 (1", Blind); 02-35997 (1-1/4", Socket); 02-36009 (1-1/4", Threaded); 02-36021 (1-1/4", Blind); 02-35998 (1-1/2", Socket); 02-36010 (1-1/2", Threaded); 02-36022 (1-1/2", Blind); 02-35999 (2", Socket); 02-36011 (2", Threaded); 02-36023 (2", Blind); 02-36000 (3", Socket); 02-36012 (3", Threaded); 02-36024 (3", Blind); 02-36001 (4", Socket); 02-36013 (4", Threaded); 02-36025 (4", Blind); 02-36002 (6", Socket); 02-36014 (6", Threaded); 02-36026 (6", Blind); 02-36003 (8", Socket); 02-36015 (8", Threaded); 02-36027 (8", Blind); 02-36004 (10", Socket); 02-36016 (10", Threaded); 02-36028 (10", Blind); 02-36005 (12", Socket); 02-36017 (12", Threaded); 02-36029 (12", Blind)
  • Manufacturer: Peabody Engineering
  • Ships From: Liberty, SC
Applications
  • Flanged tank outlets and pipe connections
Frequently Asked Questions

What else do I need?
Flange bolt kits, flange gaskets and expansion joints are sold separately.

How long does it take to ship, and where does it ship from?
It is built to order with a manufacture lead time of 3-5 weeks and ships from Liberty, South Carolina. Shipping is calculated at checkout.

Who makes it?
Peabody Engineering.

Manufacturer Documents
Shipping and Warranty
  • Manufacture Lead Time: 3-5 Weeks
  • Ships From (State): SC

Products are subject to freight or parcel shipping costs. Shipping charges are calculated at checkout based on delivery location, product size, weight, and carrier requirements.

Warranty Information
Warranty coverage varies by manufacturer and product type. For warranty details or to initiate a warranty claim, please contact Tank Supply Direct at info@tanksupplydirect.com.


Recently Viewed Products