Skip to product information

Peabody Engineering

Peabody Engineering Gemini Suction Tube Assembly with PVDF Foot Valve

Peabody Engineering Gemini Suction Tube Assembly with PVDF Foot Valve

SKU: 02-33352

3-5 Weeks
Regular price
Price: $122.00
Regular price
List Price:
Sale price
Price: $122.00
Assembly
View Cart

Description

The Peabody Engineering Gemini suction tube assembly is a 1/4" or 3/8" OD PPL tube fitting on a rigid 1/4" PVC suction pipe with a PVDF foot valve, for drawing chemical from the inner tank of a Gemini dual containment tank. It comes in versions for tanks under 60" tall and for tanks 60" and taller, with or without a 2" top plug.

Gemini suction tube assemblies draw product from the inner tank through the containment lid.

Key Features
  • Tube Fitting: 1/4" or 3/8" OD polypropylene (PPL) tube fitting
  • Suction Pipe: Rigid 1/4" PVC suction pipe
  • Foot Valve: PVDF foot valve
  • Top Plug Option: Available with a 2" top plug
  • Tank Height: Versions for tanks under 60" tall and tanks 60" and taller
Specifications
  • Manufacturer Part Numbers: Under 60" tall: 02-33352 (1/4"), 02-33353 (3/8"), 02-31800 (1/4" with 2" top plug), 02-31801 (3/8" with 2" top plug); 60" and taller: 02-33354 (1/4"), 02-33355 (3/8"), 02-33356 (1/4" with 2" top plug), 02-33357 (3/8" with 2" top plug)
  • Materials: PPL tube fitting, PVC suction pipe, PVDF foot valve
  • Fits: Peabody Gemini dual containment tanks
  • Manufacturer: Peabody Engineering
  • Ships From: Liberty, SC
Applications
  • Chemical metering pump suction from a Gemini tank
Frequently Asked Questions

Which version do I need?
Pick the tube size that matches your pump tubing (1/4" or 3/8" OD) and the version for your tank height: under 60" tall, or 60" and taller.

What is the 2" top plug option?
Those versions include a 2" top plug with the assembly.

How long does it take to ship, and where does it ship from?
It is built to order with a manufacture lead time of 3-5 weeks and ships from Liberty, South Carolina. Shipping is calculated at checkout.

Who makes it?
Peabody Engineering.

Manufacturer Documents
Shipping and Warranty
  • Manufacture Lead Time: 3-5 Weeks
  • Ships From (State): SC

Products are subject to freight or parcel shipping costs. Shipping charges are calculated at checkout based on delivery location, product size, weight, and carrier requirements.

Warranty Information
Warranty coverage varies by manufacturer and product type. For warranty details or to initiate a warranty claim, please contact Tank Supply Direct at info@tanksupplydirect.com.


Recently Viewed Products